The cornerstone of any Level 3 exam is the Lifting Plan. In Aramco, we do not "just lift." We plan. The 9-Step Lifting Plan is a mandatory workflow for any lifting operation.

Must have the SWL embossed. Reject if there is more than 10% wear or any visible cracks/deformations.

, tandem lifts, or lifts exceeding 10 tons without higher-level supervision. Key Duties

Always use a tagline to control the load, but never wrap it around your arm or body.

The Rigger Level 3 Aramco Notes provide a comprehensive guide for personnel seeking to achieve this certification. The notes cover a wide range of topics related to rigging and lifting, including:

The written exam is only half the battle. The practical exam is where most Level 2s fail to upgrade to Level 3.