The DSR is divided into major work types, each with distinct features:
Key contextual factors of that period:
The is a document published by the Public Works Department of the Government of Maharashtra. It contains a comprehensive list of items required for construction works—such as excavation, concrete, steel work, finishing, and roadwork—along with the standard rates for each item. Pwd Dsr 2015-16 Maharashtra
The Accountant General (AG) of Maharashtra sometimes reviews old contracts where the 2015-16 DSR was the agreed schedule. Auditors need to verify whether rates charged by contractors matched the DSR.
No. GST was introduced in July 2017. The 2015-16 DSR included VAT/CST and other state taxes. The DSR is divided into major work types,
Be cautious of outdated or tampered PDFs. Always verify the document’s authenticity by checking the front page (which will state “Public Works Department, Government of Maharashtra – DSR 2015-16” and have the official seal).
A 5% increase is typically applied for works within municipal corporation limits. Auditors need to verify whether rates charged by
The holds specific significance in the historical context of the state's infrastructure development. It was a period marked by a transition in material costs, the implementation of new labor laws, and a push for standardization across diverse regions like Konkan, Pune, Nashik, and Nagpur. This article provides an in-depth look at the Schedule of Rates for 2015-16, exploring its structure, the reasons for rate revisions, and its application in government tenders.